Your date, not
a standard one.
From 4 working days for the simplest box, and longer for bigger builds. You see the exact date before you pay, and it moves as you add or remove pages, because a four-page brochure and a shop are not the same amount of work.

- Your own date, on your own order
- The clock starts with your content
- You hear it from us first if it slips
4 working days
The floor. Nothing standard ships faster
2 working days
The fastest possible, with faster delivery
2
Dates on your order: first design, and live
Two dates
One we promise, one we estimate.
They answer different questions, and only one of them is entirely ours to control.
First design ready
The date on your order. This is our desk and our hours, and it is the one we hold ourselves to.
Live, typically
After your revision rounds. Most of that time is you looking at it, so we estimate it rather than promise it. Come back to us quickly and it lands sooner.
The clock starts when your content reaches us, not when you pay. If you have nothing ready to send, say so on the brief, and we will start with good stock images and swap yours in later, so nothing has to wait on a photo shoot.
What arrives
What you actually receive.
The finished site
Built to the design you picked, with your content, on your pages, working on a phone.
Set up on your hosting
In your name, with SSL. Hosting and domain fees are billed by the provider, and that is the one cost the box price does not cover.
Ownership
The site, the content and the domain are yours on final payment. Nothing is held on our account to keep you here.
It arrives finished.
Not a folder of files for you to work out. A site that is set up, working on a phone, and yours.

Timing
How the date is worked out.
- 01
The design floor
Never less than 4 working days for a standard build. That is what a design, the core pages, a review pass and a proper check on real devices actually take.
- 02
Plus what you added
Every page, section and feature you tick adds time, because each is real work. Untick it and the date comes back in.
- 03
Faster if you need it
Faster delivery halves the estimate, down to a floor of 2 working days. It cannot turn a large build into two days, and we will not pretend otherwise.
Being straight about it
What the date does and does not cover.
Inside the date
- Designing and building every page you chose
- Your content placed properly, not poured into a template
- Checking it on real phones before you see it
- Setting it up on your hosting with SSL
- Up to 6 months maintenance afterwards, depending on the order
Outside the date
- Time spent waiting for your content, photos or logo
- How long you take to review each round
- Custom work quoted separately after checkout
- Domain transfers and hosting your provider has to action
Anyone can put a fast number on a website. Far fewer will tell you which part of it they actually control. One of these dates is our desk. The other one is partly yours.
If something slips, you hear it from us first. Not after the date, and not because you asked. We will tell you what happened and what the new date is. If a missed date means you no longer want the site, the refund still stands, and there is no time limit on it.
See a real date before you pay.
Pick a box and the brief shows the exact date as you choose your pages.